EEPLIANT2 - Work Package 5 - Network Standby

Scope of action

The Work Package 5 "Network Standby" (EEPLIANT2) focusses its actions on coordinated monitoring, verification and enforcement of the multi-product sector "Connected Equipment Products" covered by the Network Standby regulation: COMMISSION REGULATION (EU) No 801/2013 (ecodesign), COMMISSION REGULATION (EC) No 1275/2008 (ecodesign); and by the External Power Supplies regulation: COMMISSION REGULATION (EC) No 278/2009 (ecodesign).

Standby Network For Article

In this regard, the work plan for this product activity includes document inspection, screen testing and full scale testing. Individual models selected for verification are being sampled on a high risk basis, and with the aim to cover the relevant market share in individual countries and across the EU. Results for individual models will be shared among the European surveillance authorities, and enforcement measures will be taken concerning the non-compliant models.

Participants

The Market Surveillances Authorities (MSAs) involved in this Work Package are from the following Member States: Austria, Bulgaria, Denmark, Germany, Ireland, Latvia, Slovenia, Sweden.

 

The final report can be found here.